Harvest Fresh Produce Packing Line
Auction starts: February 3, 2020 at
07:00 AM PST
,
Closing begins: February 26, 2020 at
06:00 AM PST
Othello, WA
Auction Type: Online
Items
Sideshift, LPG, 7804 HR Meter Reads - s/n 31636
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Sideshift, LPG, 4677 HR Meter Reads - s/n 11282
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Battery Type E0, 36 Volts, 6243 HR Meter Reads - s/n TMX250-2365-9803KF
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
LPG, 2271 HR Meter Reads - s/n E010V02388E
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
-s/n D001H05325W
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
LPG, 7790 HR Meter Reads - s/n A177B16547C w/ Malavac Rotating Bin Dump
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Dayton 1/2 Motor, 3 Phase
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 1 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 1.5 Hp Motor on M7
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 1.5 Hp Motor on M5
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
2 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
60 HZ Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Baldor 1.5 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
1.5 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
1/2 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
Baldor 5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Removal: Phase 3 - March 16-20, 2020
|
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
2 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
3.5 Hp Motor, Culls
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Baldor Motor
Wash Area Removal: Phase 3 - March 16-20, 2020 |
Baldor 3Hp Motor
Wash Area Removal: Phase 3 - March 16-20, 2020 |
E-7 26' 4" x 4' 1 1/4" Transfer Conveyor - Dayton 3 Hp Motor Including Custom Catwalk F-1 40' 9" x 1' 7 1/2" Transfer Conveyor - Baldor 2 Hp Motor E-8 24' x 4' 4 1/2" Transfer Conveyor - Motor w/ Sorting Discard Buckets for Dirt, Rocks and Culls F-4 12' 3" x 4' 4 1/4" Roller Conveyor - Motor F-2 40' 8 3/4" x 1' 7 1/2" Transfer Conveyor - Motor I-3 40' 10" x 1' 11" Discard Bin with Conveyor - Motor , 13' 2" x 2' 5" Conveyor I-4
Removal: Phase 3 - March 16-20, 2020 |
4 Motors
Removal: Phase 3 - March 16-20, 2020 |
Baldor 1.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
18 1/8" Diameter Wheel, US Motors 7.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Baldor 2 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Baldor 1.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
Reliance 1 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Divider Motor
Removal: Phase 3 - March 16-20, 2020 |
Divider Motor
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Reliance 1 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Monitor and Keyboards with updated software in 2019
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Monitor and Keyboards with updated software in 2019
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 10 Hp Engine, Ironman Gearbox, Includes Catwalk
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 5 Hp Engine, Ironman Gearbox, Includes Catwalk
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
2 Motors, 8 Row Box Filler, Catwalk
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 1.5 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
10.3'x9.9' Platform
8'x7.8' Enclosed Office Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 5 Hp
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
s/n 600-24T
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
s/n 650-97T
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
1.5 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
s/n CE-64
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Boston 3/4 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
2 Sections
Sprinkler Set up Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
240 Volts, 3 Phase, 10 H.P. - s/n 59098
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
1.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
7.5 Hp Motor, 18' 1/8" Diameter
Removal: Phase 3 - March 16-20, 2020 |
2 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
2 HP Motor
Removal: Phase 3 - March 16-20, 2020 |
1.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
1.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
3 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
3 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
3 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
3 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Baldor 2 Hp
Removal: Phase 2 - March 10-14. 2020 |
Baldor Motor
Removal: Phase 2 - March 10-14. 2020 |
Motor
Removal: Phase 2 - March 10-14. 2020 |
Motor
Removal: Phase 2 - March 10-14. 2020 |
Motor
Removal: Phase 2 - March 10-14. 2020 |
Baldor 3Hp & 1.5 Hp Motors
Removal: Phase 2 - March 10-14. 2020 |
s/n 14325, 18" Belt
Removal: Phase 2 - March 10-14. 2020 |
s/n L93 w/ 15' 1/2"x20" Spinks Scale Model A - s/n 37314
Removal: Phase 2 - March 10-14. 2020 |
1 Hp Motor
Removal: Phase 2 - March 10-14. 2020 |
Baldor 1.5 HP, E4
Removal: Phase 2 - March 10-14. 2020 |
Motor
Removal: Phase 2 - March 10-14. 2020 |
s/n D15220180 - s/n 95-065, Kwik Lok 865 Bag Closers and 874 Printers, Busch RA0063F Vacuum Pump, Large Weighing Buckets, One Bagger Not Operable
Removal: Phase 2 - March 10-14. 2020 |
Removal: Phase 2 - March 10-14. 2020
|
Electric Motor
Removal: Phase 2 - March 10-14. 2020 |
1.5 Hp Motor
Removal: Phase 2 - March 10-14. 2020 |
1Hp Motor, Includes Catwalk
Removal: Phase 2 - March 10-14. 2020 |
Baldor Reliance 2 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
2 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
Phase 2: March 10-14 from 7:00-3:00
|
s/n 204082 w/ Busch Bagger Vacuum and 16" VMC03709003 Conveyor - s/n 091003, Kwik Lok 865 Bag Closers and 874 Printers, Gooseneck Feed Elevator w/ 2 Conveyors
Removal: Phase 2 - March 10-14. 2020 |
Removal: Phase 2 - March 10-14. 2020
|
19" Belt, 20 Amp, 3 Phase - s/n 07110307
Removal: Phase 2 - March 10-14. 2020 |
s/n 207-248 with 2007 Nordson ProBlue 4 Glue Machine, 12" Conveyor Belt
Removal: Phase 2 - March 10-14. 2020 |
Fischbein Model 100 Bag Closer - s/n PBI151
Removal: Phase 2 - March 10-14. 2020 |
Graphic Operation Terminal GOT1000, (2) Kwik Lok 865 Closers 874 Printers - s/n E52385-1996, s/n 54686 1997 Newtec Ag Pak 14' x 4' 1/2" Incline Fluted In Feed Elevator, Upgraded Wicket Assemply to AP 7000 in 2018
Removal: Phase 2 - March 10-14. 2020 |
Dayton 1/2 Hp Motor
Removal: Phase 2 - March 10-14. 2020 |
Kwik Lok 865 Bag Closer with 874 Printer - s/n 5242-1996, Incline Elevator
Removal: Phase 2 - March 10-14. 2020 |
Baldor 1 Hp,Nordson Pro Blue 4 Glue with 13'x16" Incline V Belt Conveyor
Removal: Phase 2 - March 10-14. 2020 |
Baldor 1.5 Hp Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
Baldor Motor, Culls
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 Culls |
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Baldor 2 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
3 Hp Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
3 Hp Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
1.5 Hp Motor
Removal: Phase 3 - March 16-20, 2020 |
2 Hp Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
1.5 HP Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
2 Hp Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
2 HP Motor, Culls
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
Motor
Removal: Phase 3 - March 16-20, 2020 |
Baldor 1 Hp Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Industrial Ventilation Control Box
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
-s/n ABF1693DF
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
- s/n 1881
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
-s/n 1898
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
230V, 1 Phase
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
-s/n J03M545005
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
-s/n LE196319, Miller Migmatic M-25 Welding Gun, Welding Helmets
Note: Does Note Include Norco Tank photoed Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
- s/n A1163733
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Note: Tanks Not Included |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Includes Contents
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Includes, Nuts, Bolts, Washers
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
- s/n 8050029
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
2 Shelves
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Includes Contents
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Serviced Mid January 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
20 Drawers
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Shurflo 5059, Spray Gun w/ Hose Reel, 24V Spray Pump
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
8'x8'x8', Sliding Door, Electrical Lights, 3 Sides
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
4'x2.5'x4', Front Door, 3 Sides
Removal: Phase 1 - February 27-28 and March 2-6, 2020 |
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|
Removal: Phase 1 - February 27-28 and March 2-6, 2020
|